Home well drilling is a systematic project, requiring close collaboration between the user and the construction company from initial preparation to final water acceptance. As the user, maintaining appropriate involvement and clear communication throughout the process is crucial. This guide will help you understand your role and important considerations at each key stage, ensuring you obtain a well with good water quality, sufficient water volume, and a long lifespan.


I. Preparation Phase: Laying the Foundation for Success

Your active participation should begin before the drilling rig arrives.


Information Gathering and Site Selection:


Visit neighbors who have already drilled wells to learn about their well depth, water yield, water quality, and construction costs. This is the most direct reference.


Work with the construction company to determine the final well location on-site. The location should be far from potential sources of pollution such as septic tanks, livestock pens, and garbage dumps, and consider the convenience of future water use (e.g., kitchen, irrigation).


Confirm the access route to ensure the equipment can reach the well site smoothly.


Clear Agreements and Contracts:


Clearly agree upon and confirm in writing with the construction company the target well depth, well casing material and diameter, filter material specifications, payment method, construction period, and warranty responsibilities.


It is especially important to clarify how pricing will be handled if no water is found or the water volume is insufficient at the predetermined depth (e.g., per meter or a fixed price). This will avoid future disputes.


II. Construction Phase: Key Milestones, On-Site Confirmation

During construction, you don't need to constantly monitor the process, but you must be present at several key milestones.


Drilling Start Confirmation: Verify that the drilling rig model, drill rods, and drill bits match the agreed-upon specifications. Jointly confirm the precise location and angle of drilling.


Geological Layer Change Recording: During drilling, pay attention to the rock cuttings brought up from the wellbore by the construction company. When there is a significant change in soil layers (e.g., from clay to sand), inquire about and record the approximate depth. This helps in understanding the location of the aquifer.


Final Confirmation Before Casing Installation:


Well Depth Confirmation: After reaching the predetermined depth or finding a suitable aquifer, jointly measure and confirm the final well depth with the construction company. Well Casing Inspection: Inspect the well casings (usually PVC or stainless steel pipes) delivered to the site to ensure the material, diameter, and the length and position of the filter screen (perforated section) meet the specifications. Observe the well casings being securely connected section by section and slowly lowered into the well.


Filter Material Backfilling Supervision: This is a crucial step that determines the lifespan and water quality of the well. Ensure the contractor uses clean, appropriately sized gravel (filter material) to evenly fill around the well casing, rather than simply backfilling with excavated soil and sand. A good filter layer effectively filters out sediment and prevents well clogging.


Preliminary Well Flushing Observation: After the casing and backfilling are complete, the contractor will use equipment to forcefully flush the well, removing mud and sediment. Observe the water changing from cloudy to gradually clear; this is a visual preliminary acceptance test.


III. Acceptance and Delivery: Seeing is Believing, Testing is Key

After well flushing is complete, do not rush to pay the full amount. The following tests and acceptance procedures must be completed.


Water Pumping Test:


Water Volume: Allow the water pump to run continuously for several hours (usually 4-8 hours), and measure the stable water output using measuring tools (such as buckets or flow meters) to determine if it meets household water needs.


Water Level Recovery: After stopping pumping, observe the speed and height of the well water level recovery. The faster the recovery, the more abundant the water source.


Sustainability and Water Quality: Observe whether the water volume remains stable and the water quality remains clear during prolonged pumping.


Documentation and Follow-up:


Receive Construction Records: Request simple construction records from the contractor, including: final well depth, casing depth, filter material filling depth, static water level depth, etc. This is valuable "well documentation."


Clarify Warranty and Maintenance: Confirm the warranty period and understand basic well maintenance knowledge (such as avoiding excessive pumping for extended periods, regular pump inspections, etc.).


Water Quality Testing: For drinking water wells, it is strongly recommended to take water samples and send them to the local health and epidemic prevention department or a professional agency for a complete water quality analysis to ensure that all indicators meet drinking water standards.


In summary, as the user, your core role throughout the entire process is: making informed decisions and communicating effectively in the early stages, witnessing and confirming key steps in the middle stages, and conducting rigorous testing and acceptance in the later stages. Through this focused and documented approach to participation, you can not only protect your own rights but also establish a positive collaborative relationship with the construction team, working together to create a well that will provide you with peace of mind for many years to come.