Welcome: SUNMOY TECHNOLOGY COMPANY LIMITED
英文版 Spanish French 中文版
Your location: Home > News > Technology News

Technology News

A Comprehensive Guide to Participating in Your Home Well Drilling Project: From Negotiation to Acceptance

A Comprehensive Guide to Participating in Your Home Well Drilling Project: From Negotiation to Acceptance


Successfully completing a home well drilling project requires your clear involvement as the homeowner from start to finish. From initial negotiations to final acceptance, understanding each key stage and establishing good collaboration with the contractor will ensure you get a well with good water quality, sufficient water volume, and a long lifespan. The following is a comprehensive guide to help you participate throughout the process.


I. Negotiation and Contract Signing Stage: Laying the Foundation for Cooperation

This is crucial for clarifying rules and avoiding future disputes.


Clarify Technical Objectives: Clearly inform the contractor of your water needs (e.g., number of people, whether irrigation is needed), and jointly agree on the target well depth range, well casing material and diameter, and filter material specifications in writing.


Clarify Costs and Responsibilities:


Pricing Method: Clearly define whether it's a "lump-sum price" or "per-meter pricing." If the latter, you must agree on: how will subsequent costs and procedures be handled if no water or insufficient water is found at the predetermined depth?


Included Costs: Confirm whether the cost includes all materials (well casing, filter materials), equipment mobilization, initial well cleaning, and acceptance pumping.


Warranty Responsibility: Clearly state in writing the warranty period for the well and supplied materials after completion (e.g., one year).


II. Construction Preparation and Drilling Stage: Confirming Starting Conditions

On-site Confirmation of Well Location: Jointly determine the final location, avoiding pollution sources and obstacles, and ensuring equipment access.


Verify Equipment and Materials: Upon equipment arrival, verify the drilling rig model and check that the well casing and filter materials match the agreed specifications.


III. Drilling and Casing Installation Stage: Monitoring Key Stages

You don't need to supervise the entire process, but you must be present at several key points.


Confirm Drilling Start: Jointly confirm the drilling location and angle.


Monitor Geological Changes: Pay attention to the drilled cuttings (soil, sand). When there are significant changes in the soil layers, ask the contractor to explain the situation and record the approximate depth. This helps in identifying the aquifer.


Jointly Decide on Final Drilling Depth: When the predetermined depth is reached or good signs of water are found, you must jointly measure and confirm the final well depth and decide whether to continue drilling deeper. This is the most important decision point.


Supervise Casing Installation and Filter Material Filling:


Before Casing Installation: On-site verification of well casing material and filter pipe location. During pipe installation: Observe firsthand that the well pipes are securely connected and lowered smoothly.


During filter material filling (the most crucial step): Ensure the contractor uses clean, appropriately sized gravel (pea gravel) to evenly fill around the well pipes.  Absolutely prohibit the use of excavated soil and sand for backfilling. This is critical for ensuring the lifespan and water quality of the well.


IV. Well Cleaning, Testing, and Acceptance Phase: Based on Results

After well cleaning, do not rush to pay the full amount; acceptance testing must be completed.


Require thorough well cleaning: Observe the well cleaning process until the water consistently runs clear.


Conduct a test pumping test: Require continuous pumping for several hours (e.g., 4-8 hours), focusing on:


Water yield: Is it stable and sufficient to meet needs?


Water level recovery: The speed at which the water level recovers after the pump is stopped.


Water quality: Is it clear?


Complete final handover:


Receive documentation: Request the "Well Completion Record," including the final well depth, static water level, materials used, etc. This is the well's "identity card."


Site cleanup: The contractor should restore the site to its original condition.


Final payment: After confirming satisfactory water volume and quality and receiving the documentation, pay the final amount stipulated in the contract.


In summary, as the owner, your effective participation should focus on three core roles: a clear negotiator during discussions, a witness at critical stages during construction (especially determining depth, pipe installation, and filter material filling), and a decision-maker based on results during acceptance. Through this focused and documented participation, you can maximize the protection of your rights and work with the contractor to build a reliable household well.